|
On Reinforced Fill Slope
MTRC Temporary
Surcharge Embankment at Tseung Kwan O South and Approach Station
Polymeric Reinforced Fill Slope in NENT Landfill
Polymeric Reinforced Fill Slope, Yuen Long Highway
Reinforced Fill for Temporary Work in HK (3 cases)
Reinforced
Fill Slope at Chi Lin Nunnery
Tseung Kwan O Landfill - Leachate Lagoon with Reinforced Fill Embankment
¡@
On Erosion Control
Cellular Confinement Slope Reinforcement System
Environment
Improvement of Shing Mun River
Erosion
Control Mat at Lai Ping Road
Erosion Control Mat at Tsing Yi North Coastal Road
¡@
On Landfill
Kwai Chung Park Viaduct at Gin Drinker's Bay
Infrastructure over Landfill
¡@
On Waterproofing
Waterproofing Penfold Park Lake
Waterproofing Lining System - Inspiration Lake at Hong
Kong Disneyland
¡@
On Special Projects
Curvature Construction using Gabion
Electric Leak
Location Survey
¡@
|