|











| |
 |
¡@ |
 |
| Leak Location Survey at Hong
Kong Disneyland Inspiration Lake. CV/2000/09, Mar 2004. |
¡@ |
Environmental Improvement of
Shing Mun River - Stage 2 - Fabrication of Refuse Collection Floating Boom.
CV/2002/14, Apr 2004. |
 |
¡@ |
 |
| Water Leakage Collection System
at Yuen Long Water Supply Mainlaying. Aug 1998 |
¡@ |
Submarine Outfall Pipe, Cheung
Chau, Feb 2004. |
 |
¡@ |
¡@ |
| Construction of San Tin Eastern
Main Drainage Channel. Supply of Band Drain. DC/2001/09, Dec 2003. |
¡@ |
¡@ |
|